City of Marysville

City of Marysville
All Projects
Case Study · 2026

City of Marysville

The City of Marysville oversees more than 33 buildings of various sizes and ages. As the city continues to grow rapidly, the Facilities Department identified a critical need to update aging building automation systems, improve comfort, reduce energy waste, and streamline vendor support. Many buildings had outdated equipment, obsolete software, or no automation at all—leading to temperature inconsistencies, rising energy costs, and increasing maintenance burdens.

Industry
Government
Location
Marysville, OH
Year Completed
2026
Project Sites

4 locations served across this engagement

  • Marysville City Hall
  • Marysville Police Department
  • Decker Fire Station
  • Water Reclamation Facility
The Challenge

What we were asked to solve.

According to the customer, before Premier’s involvement, the city was dealing with outdated equipment, outdated software, and inconsistent performance across city buildings. Some areas were freezing, others were hot, and older monitoring systems made it nearly impossible to manage everything effectively.

The Solution

How Premier delivered.

After a competitive bid process, the City selected Premier Energy Systems for a city wide controls upgrade, including implementation of the ALC WebCTRL platform. While Premier was not the lowest bid, they offered the strongest combination of technology, service quality, security, and long-term value.

Remote accessibility has been a game changer. The customer noted that one of the biggest selling points was the open BACnet accessibility of WebCTRL which provides for not only accessibility by Premier technicians, but the city’s HVAC technicians and HVAC vendors, to connect directly and securely.

Before Premier, issues with outdated equipment increased operational problems throughout the City.

Measurable Results

Numbers the owner can point to.

Since the upgrades, the City has seen a dramatic improvement in building performance and day to day operations:

  • Complaints across major facilities have dropped significantly.
  • Staff can now view and manage all buildings centrally through WebCTRL.
  • Premier identified hidden equipment issues—such as numerous non functioning VAV boxes—that previous vendors never detected.
  • Temperature regulation and system reliability have improved across City Hall, the Police Division building, the Deco Fire Station, and the Water Reclamation facility.
  • Training, online resources, and ongoing support have helped Marysville’s team quickly gain confidence with the new system.

As Marysville continues to expand—with plans for a third fire station and a new IT building—the City intends to bring Premier into projects earlier in the construction planning process.

“I would definitely recommend Premier. Their systems use the most updated technology, won’t become obsolete quickly, and integrate well with IT. The convenience, accessibility, and partnership they offer have tremendous value. Premier understands both controls and HVAC equipment, and that makes all the difference.”
Ron Todd
Operational Facilities Manager, City of Marysville, Ohio

Ready to take
control of your building?

We assess the systems, review the sequences, and scope the integration before we quote. No charge, no obligation.

Go to Top